mach 3

Fast-drying, strength-enhancing screed additive

screed splash tp product image mach3_512x512

mach 3

Fast-drying, strength-enhancing screed additive

screed splash tp product image mach3_512x512
screed splash tp product image mach3_512x512

mach 3

Fast-drying, strength-enhancing screed additive

About this product

mach 3 is a next-generation liquid additive for semi-dry cementitious screeds, combining ultra-fast drying with outstanding strength enhancement. Its integrated processing aid optimises workability at every stage of application, enabling faster, easier, and more efficient installation.


The result: faster construction progress, superior screed performance, and maximum reliability on site.

Main features at a glance

Drying time

7 days

Strength class

C40-F6/C60-F8

BRE category

A

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 24 hours

Commissioning cycle

6 days

Working time

90 minutes

  • Faster readiness for covering just 7 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 6 days)
  • Increased compressive and flexural strength, up to C60-F8
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Particularly suitable for high-strength screeds with requirements for extremely fast drying times
  • Suitable for screeds in outdoor, indoor and permanently wet areas

Main features at a glance

Drying time

7 days

Strength class

C40-F6/C60-F8

BRE category

A

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 24 hours

Commissioning cycle

6 days

Working time

90 minutes

  • Faster readiness for covering just 7 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 6 days)
  • Increased compressive and flexural strength, up to C60-F8
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Particularly suitable for high-strength screeds with requirements for extremely fast drying times
  • Suitable for screeds in outdoor, indoor and permanently wet areas

Projects that have been optimised by our products