About this product

mach 3 is a high-performance liquid additive engineered for the production of semi-dry cementitious screeds. Its effect extremely reduces drying time while significantly enhancing the compressive and flexural strength of the screed. Thanks to its integrated processing aid, mach 3 ensures excellent workability, making mixing, pumping, spreading, levelling and smoothing noticeably easier and more efficient.

 

The result: faster construction progress, superior quality, and maximum reliability on site.

Main features at a glance

Drying time

7 days

Strength class

C30-F5 (STD), C40-F6 (HD), C60-F8 (UHD)

BRE category

A

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 24 hours

Commissioning cycle

6 days

Working time

90 minutes

  • Faster readiness for covering just 7 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 6 days)
  • Increased compressive and flexural strength, up to C40-F6
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Particularly suitable for high-strength screeds with requirements for extremely fast drying times
  • Suitable for screeds in outdoor, indoor and permanently wet areas

Main features at a glance

Drying time

7 days

Strength class

C30-F5 (STD), C40-F6 (HD), C60-F8 (UHD)

BRE category

A

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 24 hours

Commissioning cycle

6 days

Working time

90 minutes

  • Faster readiness for covering just 7 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 6 days)
  • Increased compressive and flexural strength, up to C40-F6
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Particularly suitable for high-strength screeds with requirements for extremely fast drying times
  • Suitable for screeds in outdoor, indoor and permanently wet areas