mach 2

Fast-drying, strength-enhancing screed additive

screed splash tp product image mach2_512x512

mach 2

Fast-drying, strength-enhancing screed additive

screed splash tp product image mach2_512x512
screed splash tp product image mach2_512x512

mach 2

Fast-drying, strength-enhancing screed additive

About this product

mach 2 is a high-performance liquid additive engineered for the production of semi-dry cementitious screeds. Its effect greatly reduces drying time while simultaneously enhancing the compressive and flexural strength of the screed. Thanks to its integrated processing aid, mach 2 ensures excellent workability, making mixing, pumping, spreading, levelling and smoothing noticeably easier and more efficient.

 

The result: faster construction progress, superior quality, and maximum reliability on site.

Main features at a glance

Drying time

14 days

Strength class

C20-F4 (STD), C30-F5 (HD)

BRE category

B (STD), A (HD)

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 72 hours

Commissioning cycle

12 days

Working time

90 minutes

  • Faster readiness for covering just 14 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 12 days)
  • Increased compressive and flexural strength, up to C30-F5
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Suitable for screeds in outdoor, indoor and permanently wet areas

Main features at a glance

Drying time

14 days

Strength class

C20-F4 (STD), C30-F5 (HD)

BRE category

B (STD), A (HD)

Foot traffic

after 24 hours

Normal site traffic

after 72 hours

Commissioning UFH

after 72 hours

Commissioning cycle

12 days

Working time

90 minutes

  • Faster readiness for covering just 14 days after screed laying
  • Cost and CO₂ reduction thanks to shortened UFH commissioning (only 12 days)
  • Increased compressive and flexural strength, up to C30-F5
  • Reduction in screed thickness possible due to increased strength class
  • Earlier walkability after just 24 hours
  • Earlier load-bearing capacity in terms of normal construction site traffic after just 72 hours
  • Improved workability & pumpability of screed thanks to integrated processing aid
  • Minimised cracking & cupping behaviour due to reduced shrinkage
  • For all screeds according to BS 13892/BS 8204
  • Suitable for screeds in outdoor, indoor and permanently wet areas

Projects that have been optimised by our products

Scroll to Top