Shorter construction schedules
Drying time challenges

The mach-map
In fast-moving construction, every day saved counts. Fast-drying screeds aren’t just a convenience – they’re a competitive edge. Bondera Chemicals’ mach series – mach 1, mach 2, and mach 3 – offer tailored solutions to drastically reduce drying times while boosting strength and application performance.
Let’s look at the mach-map how each additive from our series accelerates the screed drying behaviour and why they make a difference.

Construction time comparison
- Drying rate: ~1 mm/day
- 60 mm thickness = ~60 days drying
- Realistically, 60–75 days accounting for site conditions
- Drying time: 7, 14 or 21 days
- Walkable within 24 hours
- Floor coverings can be installed in as little as a week if needed
That’s a time saving of at least a month, often more. For a commercial office fit-out or retail space, that time advantage translates directly into earlier openings and reduced labor costs.

When it comes to construction projects, time is often the most expensive commodity. Contractors, builders, and clients all share the same goal: finish strong, finish fast, and get the building back into use as soon as possible. Yet, traditional cementitious screeds come with one unavoidable challenge – drying time. Left untreated, a standard screed can take weeks, sometimes months, before it’s ready for floor coverings. That’s where our mach series comes in, changing the game by cutting down drying times without compromising performance.
Benefits beyond
The primary appeal of fast-drying additives is speed, but the advantages go further:
Program efficiency
Projects can move to the next stage sooner – whether that’s flooring, decorating, or furnishing. Shorter project timelines reduce overheads.
Weather resilience
With mach-enhanced screeds are less dependent on perfect site conditions. Even in cooler or more humid climates, drying is more predictable.
Improved strength and performance
Our mach-solutions don’t just accelerate drying, they also enhance compressive and flexural strength, resulting in a more robust screed. That supports heavier traffic, industrial use, or dynamic loading scenarios.
Compatibility with underfloor heating
Quick-drying screeds pair well with underfloor heating systems, which themselves accelerate moisture loss. This makes the whole system faster to commission.
Reduced risk of moisture-related failures
Excess moisture trapped in screeds can cause adhesive failure, mold growth, or flooring defects. By reducing drying time and ensuring more controlled hydration, our additives help minimise these risks.

Where they shine
Offices, retail stores, and restaurants where opening dates are tied to revenue.
Fast-track renovations in schools, hospitals, and public buildings where downtime must be minimized.
Homeowners want to move in as soon as possible; waiting months for screeds to dry isn’t practical.
Where delays in one unit or block could knock on across the entire program.
