harb

Mineral bonding agent for concrete, mortar and screeds

screed splash tp product image harb_512x512

harb

Mineral bonding agent for concrete, mortar and screeds

screed splash tp product image harb_512x512
screed splash tp product image harb_512x512

harb

Mineral bonding agent for concrete, mortar and screeds

About this product

harb is a high-performance liquid additive engineered to create a strong and permanent bond between cementitious concrete, mortar and screeds.

Thanks to its strong and elastic adhesion effect, it can also withstand high stresses.

Main features at a glance

  • As a bonding agent for concrete
  • As a bonding agent for mortar
  • As a bonding agent for screeds
  • Suitable for wet and outdoor areas
  1. Proper subfloor preparation must be ensured by shot blasting, milling or grinding.
  2. The surface of the subfloor must be clean, absorbent, load-bearing, firm and free of cracks.
  3. After preparation, the surface must then be cleaned and watered at least 24 hours in advance so that the substrate has absorbed sufficient moisture.
  4. Avoid the formation of puddles.
  5. The size of the surface to be treated with harb must be selected so that the new concrete, screed or mortar can always be applied fresh on fresh.
  1. Mix all aggregates including the mineral bonding agent harb as described in the mix design in a container provided for this purpose.
  2. Next, stir the mixture thoroughly with a hand mixer for at least 3 minutes until a slurry is formed.
  3. Spread the ready-mixed bonding agent over the prepared subfloor and brush into the subfloor with a hard broom.
  4. Immediately cover the brushed-in bonding agent with concrete, screed or mortar to prevent it from drying out prematurely.
  5. Depending on the condition of the subfloor, material for 15-20 m² is obtained.

Engineered to meet British Standards (BS 13892/BS 8204):

Main features at a glance

  • As a bonding agent for concrete
  • As a bonding agent for mortar
  • As a bonding agent for screeds
  • Suitable for wet and outdoor areas
  1. Proper subfloor preparation must be ensured by shot blasting, milling or grinding.
  2. The surface of the subfloor must be clean, absorbent, load-bearing, firm and free of cracks.
  3. After preparation, the surface must then be cleaned and watered at least 24 hours in advance so that the substrate has absorbed sufficient moisture.
  4. Avoid the formation of puddles.
  5. The size of the surface to be treated with harb must be selected so that the new concrete, screed or mortar can always be applied fresh on fresh.
  1. Mix all aggregates including the mineral bonding agent harb as described in the mix design in a container provided for this purpose.
  2. Next, stir the mixture thoroughly with a hand mixer for at least 3 minutes until a slurry is formed.
  3. Spread the ready-mixed bonding agent over the prepared subfloor and brush into the subfloor with a hard broom.
  4. Immediately cover the brushed-in bonding agent with concrete, screed or mortar to prevent it from drying out prematurely.
  5. Depending on the condition of the subfloor, material for 15-20 m² is obtained.

Engineered to meet British Standards (BS 13892/BS 8204):

Projects that have been optimised by our products

Scroll to Top